DATA CABLING PROJECTS

Lisburn Community Care Centre
Lisburn Community Care Centre – Ongoing
Our installation package includes an Cat6 & Cat6a cabling systems including 3500No. data points, as well as the 12 Core OM4 Blown Fibre & 100 pair and 20 pair backbone installations.
The 12,792 square metre primary and community care centre for Lisburn will integrate eight GP practices currently located in the Lisburn health centre, and will be responsible for the care of around 50,000 patients.

Ulster Campus Block BC
Ulster Campus Block BC – Ongoing
Our installation package includes an Excel Networking Solutions Cat.7A cabling system including 8025No. Excel Cat.7A FFTP B2CA data points, as well as the Blown Fibre & Multipair backbone installation.
This Block will serve as a vital piece of the new 75,000sqm Belfast campus.

SWC Enniskillen
SWC Enniskillen – 2021
Our installation package included a Cat6a cabling system including 1800No. data points, as well as the 12 Core Fibre Links.
The new campus, which has been designed by Hamilton Architects, will see the delivery of the first educational building worldwide to achieve the highest international standard in environmental constructions – PassivHaus Premium, ranking it alongside prestigious buildings such as the Apple Campus 2 in terms of sustainable innovation and design.

Altnagelvin North Wing – 2020
Altnagelvin North Wing – 2020
Our installation package includes a Cat6a cabling system including 2000No. data points, as well as Blown Fibre and Multipair backbone links to existing campus comms rooms.
The North Wing facility provided an additional six 24 bed inpatient ward areas and a new main entrance to Altnagelvin Hospital.